I am a Contractor/ Builder looking for General Engineering Information

Answer: All water main/ branch installation must occur in accordance with GCWW standards. Please click here to download our construction specifications and standard drawings.

  • A separation of 18” vertically must be maintained between all water service branches and water mains from all other utilities, structures, etc..
  • A separation of 5’ horizontally must be maintained between all water service branches and water mains from all other utilities, structures, etc..

For more information on separation requirements, please contact our water main inspection section at 513-591-7851.

Answer: Flow test needed for branch or water main extension purposes must be conducted by a private contractor and must be scheduled with the GCWW valve room in advance at 513-591-7909.

Answer:

  • For bidding on GCWW Capital Improvement work, please contact the City of Cincinnati Purchasing department at 513-352-3209 or citypurchasing@cincinnati-oh.gov.
  • For bidding on Private development and Subdivision work, please contact the respective developer or engineer for the project you plan to bid.

Answer: Please contact our branch inspection section at 513-591-7837 or email at branch.inspection@gcww.cincinnati-oh.gov.

Answer: Please download the Temporary Water Use Permit Fact Sheet or contact the premise services division at 513-591-7825.

Answer: Rainwater harvesting specifications can be found here.