6th and Main to Close for Track Crossing This Week

6th Street at Main will be closed for trackwork this weekend starting Friday, June 26 at 7:00pm through Monday, June 29 at 6:00am.  Detours will be posted.

 

Be Streetcar Safe!  Visit cincinnati streetcar.com for Bike Safety Tips around Streetcar Tracks

As the summer bicycling season gets into full swing, remember to Be Streetcar Safe around streetcar tracks when riding a bicycle on City streets. 

Streetcars share the road with cyclists, but streetcar tracks can pose some special challenges for bikes. Streetcar tracks can be slippery when wet, and sometimes bike tires can get caught in the gap next to the rail.

Cyclists should be alert and use caution when riding near streetcars and streetcar tracks. Try to cross streetcar tracks at as close to a right angle as possible.  

The streetcar team is working with Cincy Red Bike to let riders know the best way to cross streetcar tracks on a bicycle.  Look for stickers on Red Bikes around town letting you know to “Cross Tracks at 90 Degrees.”

Visit cincinnatistreetcar.com for tips and information on how you can Be Streetcar Safe!

 

Block by Block Construction –June 22-28, 2015

MAIN STREET:

  • 2nd to 3rd:  sidewalk & curb repairs (2 weeks remaining)
  • 3rd to 4thsidewalk & curb repairs (2 weeks remaining); OCS foundations, rail installation, track concrete base work (1 week remaining)
  • 5th to 6th:  OCS foundations (1 week remaining), pavement removal, track concrete base work (5 weeks remaining), rail installation (2 weeks remaining)
  • 6th to 7thOCS foundations, rail installation, track concrete base work (1 week remaining)
  • 8th to 9th:   traffic signal work (1 week remaining)
  • Court to 12thtraffic signal work ( 1 week remaining)
  • At 12thOCS bracket arm banding and installation (2 weeks remaining)

 

 WALNUT STREET:

  • 2nd to Central Parkway:  sidewalk paver replacement (2 weeks remaining)
  • 2nd to Govt. Place:   traffic signal work (2 weeks remaining)
  • 7th to Central Parkway:  asphalt surface course (2 weeks remaining)
  • 9th to Central Parkway:  asphalt milling and grinding & casting adjustment (1 week remaining)

 

RACE STREET:

  • At 12th:  shelter lighting installation (1 week remaining)
  • At Liberty:  shelter lighting installation (1 week remaining)
  • At Elder:  shelter lighting installation (1 week remaining)

 

ELM STREET:

  • At 14thshelter lighting installation (1 week remaining)
  • At Liberty:  shelter lighting installation (1 week remaining)
  • At Elder:  shelter lighting installation (1 week remaining)
  • At Henry:  shelter lighting installation (1 week remaining)

 

12th STREET:

  • Elm to Main:  OCS bracket arm banding and installation (2 weeks remaining)

 

PROGRESS LAST WEEK:

bike safety

A downloadable version of the graphic above and tips on how to ride safely around streetcar tracks are available at cincinnatistreetcar.com

red bike sticker

Look for these stickers on Red Bikes around Cincinnati letting you know to "Cross Tracks at 90 Degrees."

stop signs

Meanwhile, station stop signs are going up on stations in Over-the-Rhine.

Share Article: