I am a Plumber or Fire Contractor looking for Inspection/Construction Information
Answer:
- A separation of 18” vertically must be maintained between all water service branches and water mains from all other utilities, structures, etc.
- A separation of 5’ horizontally must be maintained between all water service branches and water mains from all other utilities, structures etc.
For more information on separation requirements please contact our water main inspection section at 513-591-7870
Answer: Once plans have been approved, please contact our water main inspection section at 513-591-7870 at least 48 hours prior to your scheduled start date
Answer: Please click here to fill out the online branch inspection request form.